永利皇宮 外圍回填平整連基礎 , 管道工程 / Wynn Palace outside the backfill even with the foundation, pipeline works

Job Description:
外圍回填平整連基礎 , 地下水電管網連接及安裝, 地磚鋪設, 招牌制作安裝工程 /
Peripheral backfill with foundation,
Underground water pipe and electricity network connection and installation,
Floor tiles,
Sign production installation engineering

Location:
Contract Start Date: 2015-11
Expected Completion Date: 2016-04
Client: 禮頓建築 (亞洲) 有限公司 / Leighton Construction (Asia) Limited